Technology Explained
Biomimicry meets breakthrough engineering.
Our patented geodesic dome uses passive cooling inspired by nature’s thermodynamics. Hot air rises, fresh air circulates—no chillers, raised floors, or exhaust systems required.
- Geodesic Dome Architecture
Maximizes airflow with minimal surface area, reducing thermal buildup and structural material - Thermal Buoyancy Cooling
Heat naturally rises through the dome’s apex, pulling in cool air without mechanical systems - Integrated Fan Walls & Smart Control
Dynamically adjust airflow in response to real-time sensor data for consistent temperature and uptime
1
2
3

1
Thermal Buoyancy Cooling
2
Geodesic Dome Architecture
3
Integrated Fan Walls & Smart Control
Energy & Water Efficiency
Smarter Infrastructure. Sharper ROI.
AI and HPC demand more power. Our systems use less—and cost less to run.
- 1.13 PUE (vs. 1.6–2.0 industry avg)
Cut energy waste and reduce operating expenses by up to 34% - 0.1 WUE (vs. 1.4 avg)
Use 92% less water per year—eliminating costly cooling towers and climate exposure - No HVAC, No Downtime
Designed to run in extreme climates without mechanical cooling
ESG & Sustainability
Not just sustainable. Regenerative.
ServerDomes doesn’t just mitigate environmental harm—it reimagines digital infrastructure in alignment with ESG goals.
- Zero HVAC = Lower Carbon Footprint
No refrigerants. No compressors. No mechanical cooling loads. - Bioswale & Passive Water Reclamation
Each campus includes stormwater capture, filtration, and reuse strategies - Lights-Out Operations
Minimal human maintenance, reduced emissions, and remote monitoring - ESG-Aligned Investing
Support green infrastructure and digital equity with long-term ROI
Deployment Process: 12 Months to Live
From land to live compute in under a year.
ServerDomes delivers full capacity within 12 months—compared to 3–5 years for traditional builds.
Here’s how we do it:
- Pre-Commit Power & Customers
Each dome launches with 5–10MW already committed - Assemble in Houston, Deploy Nationwide
Dome components are shipped for rapid assembly - Minimal Permitting Requirements
Single-acre footprint and dome structure reduce zoning friction - Local Contractor Integration
Avoids big GC bottlenecks and supports local economies - Vendor-Neutral, Lights-Out Design
Plug-and-play with your own stack or ours



